Posts: 1,255
Threads: 119
Joined: Apr 2008
Lachlan Valley Railway Late May
Steam Sydney to Grafton for about 3 to 4 weeks
http://www.lvr.com.au/sched.htm
Posts: 425
Threads: 7
Joined: May 2007
Sounds like the resheduled trip from last year???
Posts: 1,255
Threads: 119
Joined: Apr 2008
(29-Mar-2010, 07:31 PM)Petan link Wrote:Lachlan Valley Railway Late May
Steam Sydney to Grafton for about 3 to 4 weeks
http://www.lvr.com.au/sched.htm
Dear WOS boss, opps, I should have started this thread on the other LVR tour thread.
http://www.wheelsonsteel.com.au/index.ph...n#msg79393
If need be shift my LVR Grafton trip thread to the main LVR thread.
Sorry
:bozo Peter :bozo